Code Compliance Certificate Application Process Explained

Author

Posted Oct 28, 2024

Reads 859

Lines of Code
Credit: pexels.com, Lines of Code

Applying for a code compliance certificate can be a daunting task, but understanding the process can make it more manageable.

You'll need to submit an application to the local building authority, which typically requires a fee. The application fee varies depending on the jurisdiction.

To ensure your application is complete, make sure you've gathered all the necessary documentation, including plans, specifications, and a detailed description of the work to be done.

The building authority will review your application to ensure it meets the relevant building codes and standards.

Code Compliance Certificate Application Process

To start the Code Compliance Certificate application process, you'll need to lodge your application as soon as possible. This can be done through the Opotiki District Council's online services, where you'll need to upload all required documents.

You'll need to provide names and contact details for all people involved in your project, including builders, plumbers, and engineers. Without a Code Compliance Certificate, you may experience difficulties insuring your property or selling it in the future.

Credit: youtube.com, What is a Building Code of Compliance Certificate (CCC)?

The application is considered complete when lodged on the correct form, and the CCC processing clock will begin. This clock will be stopped if the Building Consent Authority (BCA) needs to consider other documents, and a Request for Further Information (RFI) letter will be sent to the owner.

The required documents may include:

  • Producer statements (PS4s) from experts (engineers etc.) along with site observations
  • Producer statements construction (PS3s) and product warranties
  • Plumbing and drainage producer statements, including pressure test
  • As-built drainage plan

The BCA has 20 working days to decide whether to issue a code compliance certificate or refuse to issue. If the application is refused, you have a right of appeal against the decision by applying to the Ministry of Business Innovation and Employment for a determination under section 177 of the Building Act 2004.

You can apply for a CCC through the Objective Build Portal, where you'll need to provide a minimum of several documents, including electrical completion certificates, gas works certificates, proof of ownership, and information to demonstrate that installed specified systems meet the performance standards identified in the building consent.

For another approach, see: Ssl Certificates

Understanding Code Compliance Certificate

Credit: youtube.com, From What Year Can You Rely on a Code of Compliance Certificate?

A Code Compliance Certificate (CCC) is a crucial step in the building process, and it's essential to understand what it entails. You can apply for a CCC through the Objective Build Portal, where you'll need to provide various documents, including electrical and gas certificates, proof of ownership, and information about installed systems.

To apply, you'll need to gather the required documents, which may include an electrical completion certificate, gas works certificate, and proof of ownership. These documents will be listed on your required items letter, which should have accompanied your building consent.

The Building Consent Authority (BCA) has 20 working days to decide whether to issue a CCC after your application is accepted. During this time, they may conduct an inspection or request additional information from you.

If you're building a residential property, you can occupy it before a CCC is issued. However, if your building is open to the public, you won't be able to use it until a CCC is issued. This includes shopping malls, cinemas, and other public premises.

Credit: youtube.com, What is Code Compliance?

Here are some examples of public premises that require a CCC before use:

  • shopping malls
  • cinemas
  • marae
  • camping grounds
  • garages and workshops
  • funeral homes
  • office / retail complexes
  • rest homes

In some cases, you may be able to apply for a Certificate for Public Use, which will allow you to use the building before a CCC is issued. However, this is not an interim signoff, and a CCC is still required eventually.

Producer Statements and Inspections

A producer statement is a document declaring a professional opinion, and it's sometimes accepted by the BCA as part of the building consent process. This statement is usually required for design work that goes beyond the acceptable solution.

A Design Review Producer Statement (PS-2) is needed when the design is reviewed by a Chartered Professional Engineer (CPEng). The owner is responsible for the costs of this process. This statement provides greater confidence for all stakeholders that the resulting work will be compliant and safe.

The BCA will determine what inspections are necessary to ensure compliance with the building consent. A list of required inspections will be attached to the issued building consent. You cannot start building work until the building consent has been granted.

Credit: youtube.com, Williamson County: Certificate of Compliance Application Process

A typical inspection involves verifying that the construction is to the consent plans. The inspector will make records during the inspection and may take photos of the work. A record of the inspection will be available within the Objective Build portal.

Here are three typical outcomes of an inspection:

  • Passed: the inspector is happy for the work to continue.
  • Failed: any failed items will need to be remedied before new work can continue.
  • Partial: Conditional continuation: parts of the work can continue while other parts are remedied or completed.

What Is Durability Modification

A durability modification is a change to B2 of the Building Code that 'back-dates' the effectual start date of the statutory durability timeframes.

The Building Act's S67 enables the Territorial Authority (TA) to modify aspects of the building code related to a specific building consent.

A durability modification is requested as an amendment to the building consent, and will be notified to MBIE.

Even if a durability modification is granted, the building work must still be compliant at the time the Code Compliance Certificate (CCC) is considered.

Producer Statements

A producer statement is a document that declares a professional opinion, and in some cases, the BCA may accept it.

Credit: youtube.com, New Producer Statements & Quality Docs - Engineers

It's used to clearly identify the intent of the design and construction details required for completion, and it's usually accepted in the processing of a Building Consent.

A producer statement for design (PS-1) has been accepted in the past, but a Design Review Producer Statement (PS-2) may be required for peer review by a Chartered Professional Engineer (CPEng).

This process can be completed by the council or by electing to have the structural design reviewed by another BCA-approved engineer, with all costs being the responsibility of the owner.

A peer review is required when design is outside the scope of the acceptable solution, and the BCA must accept your reviewing engineer prior to the review occurring.

Typical Inspections

Typical inspections are a crucial part of the building process. You'll find a list of required inspections in your building consent pack, and it's your responsibility to ensure they occur at the right time.

Inspectors will verify that construction is done to the consent plans. To prepare for an inspection, have all plans and specifications available on-site.

Credit: youtube.com, Inspections versus Audits - Key Concepts in Project Management

Having someone on-site who can communicate with the building officer, answer questions, and receive instructions is also essential. You must provide safe access to and from the site, and if scaffolding is provided, it must meet Health and Safety requirements.

A record of the inspection will be available within the Objective Build portal, and a copy can be emailed to the owner or any other person who requests it. There are three typical outcomes of an inspection: Passed, Failed, or Partial.

Here are the three typical outcomes of an inspection:

Re-inspection of failed items may be required before continuing work.

Application and Occupancy

You can apply for a Code of Compliance Certificate (CCC) yourself, but it requires a lot of paperwork, including certificates from tradespeople and a builder's Certificate of Works.

To apply for a CCC, you'll need to gather all the required documentation, such as certificates for critical materials and warranties.

Credit: youtube.com, Documentation Systems and Code Compliance - Occupancy

If you're working on a building that's open to the public, you may need to obtain a Certificate of Public Use before the CCC is issued. This ensures people using the building can do so safely while work is underway.

To apply for a Certificate of Public Use, you'll need to fill in an application form and pay a fee.

If your building is residential, you can occupy it before the CCC is issued. However, if it's open to the public, you can't use it until the CCC is issued.

Some examples of public premises include shopping malls, cinemas, and rest homes.

Here are some examples of public premises that require a Certificate of Public Use:

  • shopping malls
  • cinemas
  • marae
  • camping grounds
  • garages and workshops
  • funeral homes
  • office / retail complexes
  • rest homes

Fees and Consequences

You'll need to pay a final invoice for any outstanding costs, which will be issued by the Council after processing your application.

This invoice will cover costs such as processing amendments and additional inspections.

You won't be able to get your CCC until this invoice is paid in full.

Fees

Credit: youtube.com, Impact Fees - What You Should Know And Why

You'll need to pay a final invoice to cover outstanding costs, including any amendments or additional inspections. This invoice will be sent by Council and must be paid before they can issue the CCC.

The invoice will cover all costs associated with processing your application, including any extra inspections that weren't accounted for at the processing stage.

Consequences of Not Applying for a CCC

If you don't apply for a CCC, you may face difficulties in insuring your building.

A long delay between completing your project and applying for a CCC can lead to problems down the line.

You may be required to open up and/or upgrade your building if it can't be proven that construction was done according to the Building Consent.

Frequently Asked Questions

What is a CCC certificate?

A CCC certificate is a document that proves a building meets the Building Code and matches the approved building plans. It's often required for selling a home, securing loans, or applying for insurance.

What does "no CCC" mean?

A 'no CCC' means the building has failed to comply with the Building Code in some way, not just regarding weathertightness. To understand the reasons, you'll need to obtain and review the Property File

Landon Fanetti

Writer

Landon Fanetti is a prolific author with many years of experience writing blog posts. He has a keen interest in technology, finance, and politics, which are reflected in his writings. Landon's unique perspective on current events and his ability to communicate complex ideas in a simple manner make him a favorite among readers.

Love What You Read? Stay Updated!

Join our community for insights, tips, and more.